top of page
Aerial view of a completed tank with the Melbourne skyline behind

PROJECTS

Our projects

Civil works for fuel terminals, gas compressor stations, water tanks and Defence sites, most of them inside live, operating facilities.

SELECTED WORK

Fuel, gas, water and Defence projects

A selection of recent civil scopes. Ask us for references or more detail on any of these jobs.

Civil works at the APA gas compressor station

GAS

APA Worm Compressor Station

Bulk and detailed excavation, 80+ concrete footings, electrical trenching, pile footings, hardstand, manifold slabs and drainage among live gas assets.

Foundations for two 42 m fuel tanks at the United Petroleum terminal

FUEL TERMINAL

United Petroleum Terminal Expansion

30,000 m³+ of cut, foundations for two 42 m diameter fuel tanks, earthen bunds, pipework footings and 500 m of site roads, graded with GPS.

Ring beam for the Viva Energy T13 fuel tank

FUEL TERMINAL

Viva Energy T13 Tank Construction

About 3,000 tonnes of contaminated waste removed, an old tip site remediated, a new inverted-T ring beam, crushed rock infill and bitumen sand cap.

New kerb and road works inside the Ampol Newport terminal

FUEL TERMINAL

Ampol Project Horizons, Newport Terminal

80+ pipe support footings, a new access road, hardstand, manifold slabs and drainage in confined areas of a working terminal.

Water tank foundation works at Mernda for Yarra Valley Water

WATER INFRASTRUCTURE

Yarra Valley Water Mernda Water Tanks

Ring beams and bases for two tanks, about 2,000 m of 150–600 mm water mains, a retaining wall, sealed roads with kerbs and subsurface drainage.

Sub-base rehabilitation under an ESSO oil tank

OIL AND GAS

ESSO Tank Rehabilitation Project

Contaminated fill removed and sub-base regraded under four 62 m diameter oil tanks, a 50 mm bituminous sand layer laid and ring beams repaired.

Completed water tank base and ring beam at Epping

WATER INFRASTRUCTURE

Epping Water Tank Construction

Ring beam and tank base, two 819 mm mains routed around services and under the tank, 60 m of retaining wall, drainage and a sealed access road.

Water tank footings and pipelines at the Defence site in Mulwala

DEFENCE

Department of Defence Mulwala Fluoridated Water Tank

Earthworks, tank footings and base, and about 100 m of four DICL pipelines (150–375 mm) through rock under existing mains, plus valves and pits.

GET A PRICE

Have a civil scope to price?

Send us your drawings or scope and we'll come back with a price and program.